As with most diy projects preparation is key.
Marble laying procedure.
Follow these simple guidelines to properly install marble tile.
Test the floorboards to make sure they are sturdy.
Cement board also is engineered to bond very well with thin set mortar adhesive which you will use to install your marble tile.
Marble flooring shall be set with thick wet mortar bedding on sand bedding with a thickness of 25 30 mm.
Make sure the surface you are laying the tiles on is even clean and dry.
B each stone shall be carefully set into a level and line required and shall be beaten along full surface area to ensure firm setting and full contact between mortar and back surface of the stone.
Marble installation manual author.
How to install marble flooring.
Installing marble floor tile is not an easy process but can be done on your own if you are careful and patient.
To install cement board spread thin set adhesive over the wood subfloor using a 1 4 inch notched trowel.
Tips on installing marble flooring.
A level floor is a must for installing a marble floor.
Check the slope on the floor.
This method statement provides the control sequence and installation methodology that will be used for supply laying and fixing or installation of stone flooring marble granite flooring finishes shown on the approved shop drawings or finishing schedules in compliance with the project specification.
Lay the cement board sheets into the thin set and fasten them to the subflooring with 1 1 4 inch cement board.
If they are not the grout between the tiles could crack.